Case Study

Sandford on Thames – Kitchen Replacement

Service

Kitchen & Bathroom Replacements

Location

Oxfordshire

Completed

2023

22 Rock Farm Lane - Kitchen Replacement

Project Overview

The client began with the construction of a rear extension before commissioning a full kitchen replacement. The chosen kitchen design was bespoke, incorporating modern appliances, improved lighting and effective extraction. The aim was to create a functional and stylish cooking and dining environment that complemented the newly extended living space. The project was carefully managed to integrate the kitchen installation seamlessly with the completed building works.

Scope of Works

The project included:

Our Approach

We worked closely with the client to finalise the bespoke kitchen design, ensuring it met both aesthetic and practical requirements. Our in-house team managed the installation from start to finish, coordinating with suppliers to ensure the timely arrival of appliances and fixtures. The lighting and extraction systems were installed to enhance usability and comfort, with all works completed to high-quality standards.

Gallery

The Result

The finished kitchen provides a modern, well-equipped space that serves as the heart of the home. The bespoke units, integrated appliances and tailored lighting combine to create a functional yet visually appealing environment. The installation complements the rear extension perfectly, providing an open and inviting area for cooking, dining and entertaining. Delivered on time and to specification, the project met the client’s vision in full.

42 Bushey Road - New Build Development

Cotswold Property – New Build Development

New three-bedroom home with open-plan living, wood burner, modern bathrooms and stylish finishes, built after demolition of an existing garage in Oxfordshire.
new build development by property care

Witney Property – New Build Development

Two modern two-bedroom homes built after demolition of an extension, featuring energy efficiency, combi boilers and wider doors for future mobility access.

Filter Case Studies

Case Study Filter