Following the careful demolition of the existing garage, our team prepared the site for the new build, ensuring a solid foundation for the property. The design and construction phases were managed in-house, allowing us to maintain close control over timelines and quality. The open-plan layout was carefully planned to maximise natural light and create a sense of flow between the kitchen, dining and living areas. High-quality materials and modern heating systems were specified to ensure comfort, efficiency and lasting performance.